Access a project-level cash flow analysis and quickly visualize the difference between planned actual and forecast with built-in dynamic charts to ensure plans are being met, risk is mitigated, and profit is maximized.
Built-In Forecast Distribution Curves
- Perform forecast distributions for each budget line item with four built-in forecast distribution curves, including front-loaded, rear-loaded, typical, and linear (when required, you can manually override).
- There are three ways to access the distribution curve functionality.
-
- OPTION 1: Via the Forecast Distribution section of the budget item’s details flyout panel.
-
- OPTION 2: Within the Forecast Tool via the more menu (three-dot menu) of a budget line item in the Cost & Time view.
- From this view you can also select multiple budge items and batch create forecast distributions.
- If you use a grouped view (via. filters) you can multi-select by the group header.
-
- OPTION 2: Within the Forecast Tool via the more menu (three-dot menu) of a budget line item in the Cost & Time view.
- A Create Forecast Distribution dialog box will appear when creating a forecast distribution, add in the distribution start and end date. When performing distributions to items connected to the schedule, dates automatically pull in.
- Choose the Curve from the drop-down menu; front-loaded, rear-loaded, typical, and linear. Note, a Budget with a time-based unit can only be distributed with a linear curve.
- Select, Create.
- The details flyout panel will update to display a graphic representation of the distribution.
- Choose to display the information by amount or percent.
- Select the three dot more menu to delete the distribution.
- Use the control icon to access the chart’s settings to display the chart by period, cumulative, or cumulative & by period.
- Select the arrow icon to expand the chart view.
Project Level Cash Flow Analysis
- Once all budget line items are forecasted, teams can access a project-level cash flow analysis to easily visualize the cash flow distribution throughout the project lifecycle.
- This real-time summary enables teams to see planned actual and forecast quickly. It also provides the ability to drill into details if needed.
- To access this, open the Forecast tool via the left sidebar then, select the Cashflow tab.
Time-Versus-Money Chart Navigation
- To display the built-in dynamic time-versus-money chart, select the chart icon.
- Click Revised Budget, Work Completed, Actual Cost, or Forecast Final Cost to switch between views.
- Choose to display the information by amount or percent.
- Use the control icon to access the chart’s settings to display the chart by period, cumulative, or cumulative & by period.
- Hover over a specific point on the chart to view detailed information.
- With the details view open, select the name of a budget item to view specific information/make updates within the details flyout panel. The graph will also change to display the information relevant to that item for the particular view you’re in.
- To delete distribution directly from the table select the three dot more menu.
Forecast Distribution Date in Details Flyout Panel
- When a budget payment application, cost payment application or expense is approved, the ‘Forecast Distribution’ date field within the details flyout panel will display the same date as the ‘Approved’ date.
- However, it can manually be modified manually to meet your needs.